Project 09 / 14 — Renovation

Bathroom
Renovation.

A private bathroom rebuilt from the slab — new plumbing runs, vanity, walk-in shower, finish-grade tilework. Documented across fourteen frames from strip-out to handover.

LocationVientiane Capital
ScopeStrip-out & Rebuild
YearDelivered
TypePrivate Bathroom
Notes from the build

A small-scope renovation handled with the same discipline as a full build. The bathroom was stripped to slab. Plumbing was replanned around a fixed vanity position and walk-in shower; cold-water and hot-water runs were re-routed to current spec.

Tilework was set out before laying — every cut placed deliberately, every line returned. The vanity and shower were installed as finishing trades only after waterproofing was witnessed.

Renovations are the trade where shortcuts compound. We don't take them.

Next in the ledger Singha Music Studio